Project: National Gas Feeder 3 Pipeline Diversion
Location: Norfolk
Client: A.Hak Pipelines & Facilities UK
Area Covered: 13,400 m2
Soil Science began testing and sampling in July 2023, for A.Hak on the National Gas Diversion scheme in Norfolk. This being a vital aspect of the pre-construction activities prior to installing compounds, haul roads and working platforms for the enabling works for the Gas diversion scheme. Pre-Construction activities also included Landowner meetings to discuss the methodology being used.
Using SUREGROUND (Patent Pending) reversible binder, Soil Science then enhanced existing subsoil on site to achieve a minimum of 350kn/M2, in many areas on the project this well exceeded 700kn/m2 without affecting the agreed contract value for the works. Following this, Soil Science then laid and compacted 100mm of type one as a protective layer.
The SUREGROUND process was chosen over the traditional design depth of 500mm to meet site temporary works requirements, thus giving the project significant reductions in carbon, vehicle movements, programme and cost.
Soil Science will reverse the process, as part of the decommissioning phase on completion of the main works in 2024, recycling all aggregate on site and returning soils to their original properties, prior to agricultural processes. The decommissioning will also include further testing regimes to give quality assurance to A.Hak when handing back the land parcels to their client, National Gas and the local landowners.
This is the first time that this technique has been used on a National Gas project and is testament to the collaborative working relationship between Soil Science Ltd, A. Hak and National Gas.
- Cost saving 30%
- Programme saving 70%
- Carbon Reduction 47%
- Vehicle Movement Reduction 80%
- Aggregate Reduction 80%